Impact Analysis of Government Regulation No. 14 of 2021 on Construction Project Efficiency

DOI:

https://doi.org/10.58421/gehu.v5i4.2050

Authors

  • Aris Krisdiyanto Universitas 17 Agustus 1945 Semarang
  • Althea Serafim Kriswandaru Universitas Sains dan Teknologi Komputer
  • Kemmala Dewi Universitas 17 Agustus 1945 Semarang

Keywords:

Construction Governance, Project Performance, Public Infrastructure Policy

Abstract

This study examines the implementation of Government Regulation No. 14 of 2021, which amended Government Regulation No. 22 of 2020 concerning the governance of construction services in Indonesia, and its implications for construction project efficiency. The regulation was introduced to strengthen management systems, improve the competencies of construction business actors, and promote efficiency, transparency, and accountability in project implementation. This study was conducted on ongoing construction projects in Indonesia, focusing on construction activities involving contractors, consultants, and commitment-making officials. A qualitative approach was employed to examine stakeholder perceptions and field evidence regarding the implementation of the regulation, particularly in relation to project timeliness, cost control, work quality, and administrative compliance. Data were collected through in-depth interviews with contractors, consultants, and commitment-making officials, as well as direct observations of ongoing construction projects. The data were analyzed using thematic analysis through data familiarization, coding, identification of themes, systematic presentation of findings, and conclusion drawing. The findings, based on both stakeholder perceptions and observational evidence, suggest that the implementation of the regulation is associated with improvements in professionalism, transparency, and administrative compliance in the construction procurement process. Participants perceived that improved management and procurement practices supported more effective cost control and better work quality. However, during the initial implementation period, increased administrative requirements and adjustments to licensing mechanisms were perceived as contributing to temporary delays in project implementation. The findings indicate that the effectiveness of the regulation depends largely on the readiness of human resources and the institutional capacity of implementing agencies. Therefore, optimizing the implementation of Government Regulation No. 14 of 2021 requires stronger coordination among stakeholders, comprehensive regulatory socialization, improved human resource capacity, and continuous managerial adjustment.

Downloads

Download data is not yet available.

References

K. Castañeda, O. Sánchez, R. F. Herrera, and G. Mejía, “Deficiencies causes in road construction scheduling: Perspectives from construction professionals,” Heliyon, vol. 11, no. 2, 2025, doi: 10.1016/j.heliyon.2024.e41514.

F. H. Abanda, B. Balu, S. E. Adukpo, and A. Akintola, “Decoding ISO 19650 through process modelling for information management and stakeholder communication in BIM,” Buildings, vol. 15, no. 3, p. 431, 2025, doi: 10.3390/buildings15030431.

J. Zhou, J. Guo, and W. Xu, “Construction of big data comprehensive pilot zones, new quality productive forces and transformation of watershed resource–based cities: Double machine learning approach,” Sustain. Cities Soc., vol. 120, p. 106144, 2025, doi: 10.1016/j.scs.2025.106144.

A. Alhadi, B. D. Tom, and R. Yacine, “Enhancing asset management: Integrating digital twins for continuous permitting and compliance-A systematic literature review,” J. Build. Eng., vol. 99, p. 111515, 2025, doi: 10.1016/j.jobe.2024.111515.

Z. Cai, F. Dai, Z. Yan, Y. Liu, B. Zhang, and M. Wei, “Dynamic mechanical response and failure behaviour of single-flawed rocks under combined compression-shear loading,” Eng. Fract. Mech., vol. 314, p. 110777, 2025, doi: 10.1016/j.engfracmech.2024.110777.

A. H. Ali, A. F. Kineber, A. Elyamany, A. Hussein Ibrahim, and A. O. Daoud, “Exploring stationary and major modular construction challenges in developing countries: a case study of Egypt,” J. Eng. Des. Technol., vol. 23, no. 2, pp. 569–598, 2025, doi: 10.1108/JEDT-03-2023-0099.

J. Chen et al., “Effects of loading paths and initial densities on mechanical response and gradation evolution of calcareous sand,” Eng. Geol., vol. 346, p. 107908, 2025, doi: 10.1016/j.enggeo.2025.107908.

S. D. Datta et al., “Critical project management success factors analysis for the construction industry of Bangladesh,” Int. J. Build. Pathol. Adapt., vol. 43, no. 3, pp. 482–511, 2025, doi: 10.1108/IJBPA-01-2022-0006.

U. Asif, W. A. Khan, K. A. Naseem, and S. A. S. Rizvi, “Enhancing the predictive accuracy of marshall design tests using generative adversarial networks and advanced machine learning techniques,” Mater. Today Commun., vol. 45, p. 112379, 2025, doi: 10.1016/j.mtcomm.2025.112379.

X. Cui, P. Li, Z. Ge, S. Li, and Y. Chen, “Experimental study on face stability of shield tunnel in water-rich inclined composite strata considering different inclination angles,” Appl. Ocean Res., vol. 154, p. 104323, 2025, doi: 10.1016/j.apor.2024.104323.

H. Chen, Y. Lei, L. Xia, M. Deveci, Z.-S. Chen, and Y. Liu, “Dynamic evaluation of the safety risk during shield construction near existing tunnels via a pair-copula Bayesian network,” Appl. Soft Comput., vol. 169, p. 112583, 2025, doi: 10.1016/j.asoc.2024.112583.

C. Ding, X. Guo, C. Xiao, Z. Sui, and Y. Yang, “Experimental Study on the Influence of Blast Hole Bottom Cushion Medium on Blasting Damage Characteristics and Strain Evolution of Rock Mass: C. Ding et al.,” Rock Mech. Rock Eng., vol. 58, no. 2, pp. 1895–1909, 2025, doi: 10.1007/s00603-024-04276-9.

X. Gao et al., “Effects of saline contents on tensile behavior and fiber-matrix interaction in seawater sea-sand engineered cementitious composite (SS-ECC),” Constr. Build. Mater., vol. 467, p. 140306, 2025, doi: 10.1016/j.conbuildmat.2025.140306.

I. Ranjbar, Y. Ventikos, and M. Arashpour, “Deep learning-based construction and demolition plastic waste classification by resin type using RGB images,” Resour. Conserv. Recycl., vol. 212, p. 107937, 2025, doi: 10.1016/j.resconrec.2024.107937.

M. R. Munaro and S. F. Tavares, “Design for adaptability and disassembly: guidelines for building deconstruction,” Constr. Innov., vol. 25, no. 2, pp. 665–687, 2025, doi: 10.1108/CI-10-2022-0266.

S. Metvaei, K. Aghajamali, Q. Chen, and Z. Lei, “Developing a BIM-enabled robotic manufacturing framework to facilitate mass customization of prefabricated buildings,” Comput. Ind., vol. 164, p. 104201, 2025, doi: 10.1016/j.compind.2024.104201.

C. He, W. He, M. Liu, S. Leng, and S. Wei, “Enriched construction regulation inquiry responses: A hybrid search approach for large language models,” J. Manag. Eng., vol. 41, no. 3, p. 4025001, 2025, doi: 10.1061/JMENEA.MEENG-6444.

A. F. Kineber, A. E. Oke, A. H. Ali, O. Dosumu, K. Fakunle, and O. I. Olanrewaju, “Critical application areas of radio frequency identification (RFID) technology for sustainable construction in developing countries: the case of Nigeria,” J. Eng. Des. Technol., vol. 23, no. 3, pp. 895–916, 2025, doi: 10.1108/JEDT-05-2023-0191.

Y. Li, X. Weng, D. Hu, Z. Tan, and J. Liu, “Data-driven method for predicting long-term underground pipeline settlement induced by rectangular pipe jacking tunnel construction,” J. Pipeline Syst. Eng. Pract., vol. 16, no. 3, p. 4025046, 2025, doi: 10.1061/JPSEA2.PSENG-1855.

G. Mai, Z. Xiong, H. Zhu, L. Zhou, H. Zhou, and L. Li, “Durability of GFRP bars embedded in seawater sea sand concrete in marine environments,” Constr. Build. Mater., vol. 458, p. 139488, 2025, doi: 10.1016/j.conbuildmat.2024.139488.

Z. Li, R. Yuan, R. Hou, B. Zhou, and H. Chen, “Construction of an algal-bacterial symbiosis system and its application to municipal wastewater treatment: A review,” Process Saf. Environ. Prot., vol. 196, p. 106846, 2025, doi: 10.1016/j.psep.2025.106846.

H. Linqi et al., “Damage distribution characteristics and space optimizations of the large-diameter deep multi-holes blasting in thick ore bodies,” Tunn. Undergr. Sp. Technol., vol. 156, p. 106264, 2025, doi: 10.1016/j.tust.2024.106264.

Y. Liu, W. Zhuang, C. Gao, C. Wei, L. Xue, and Q. Yang, “Creep parameter inversion and long-term deformation prediction of a near-dam slope considering spatio-temporal deformation data during construction and impoundment period,” Eng. Geol., vol. 351, p. 108043, 2025, doi: 10.1016/j.enggeo.2025.108043.

M. G. Mohamed, M. G. Kotp, A. Osama Mousa, Y.-S. Li, and S.-W. Kuo, “Construction of Fe-and N-doped microporous carbon from ferrocene-based conjugated microporous polymers for supercapacitive energy storage,” ACS Appl. Energy Mater., vol. 8, no. 4, pp. 2389–2402, 2025, doi: 10.1021/acsaem.4c02968.

T. D. Moshood, J. O. B. Rotimi, and W. Shahzad, “Enhancing sustainability considerations in construction industry projects,” Environ. Dev. Sustain., vol. 27, no. 12, pp. 29287–29313, 2025, doi: 10.1007/s10668-024-04946-2.

J. Sagan and A. Mach, “Construction waste management: Impact on society and strategies for reduction,” J. Clean. Prod., vol. 486, p. 144363, 2025, doi: 10.1016/j.jclepro.2024.144363.

X. Shi et al., “Evaluation of risk factors affecting the safety of coal mine construction projects using an integrated DEMATEL-ISM approach,” Eng. Constr. Archit. Manag., vol. 32, no. 5, pp. 3432–3452, 2025, doi: 10.1108/ECAM-02-2023-0103.

M. Sozeau, Y. Forster, M. Lennon-Bertrand, J. Nielsen, N. Tabareau, and T. Winterhalter, “Correct and complete type checking and certified erasure for coq, in coq,” J. ACM, vol. 72, no. 1, pp. 1–74, 2025, doi: 10.1145/3706056.

C. Tian, H. Sui, Y. Chen, W. Wang, and H. Deng, “Estimating carbon emission reductions from China’s ‘Zero-waste City’ construction pilot program,” Resour. Conserv. Recycl., vol. 212, p. 107975, 2025, doi: 10.1016/j.resconrec.2024.107975.

N. Ulloa, M. A. M. Leon, L. F. S. Palmay, and M. M. Castillo, “Evaluating the compressive strength of industrial wastes-based geopolymer concrete with machine learning models,” Constr. Build. Mater., vol. 472, p. 140891, 2025, doi: 10.1016/j.conbuildmat.2025.140891.

L. Wang, Y. Huang, Y. Wang, B. Gu, B. Li, and D. Fang, “Comprehensive lifecycle safety risk assessment for construction robotics using TS fault tree analysis and Bayesian network,” Autom. Constr., vol. 172, p. 106041, 2025, doi: 10.1016/j.autcon.2025.106041.

J. Xu, L. Zheng, Z. Yu, Y. Li, and G. Cai, “Effects of bending stiffness and interface roughness on tunnel-embedded wall interaction,” Tunn. Undergr. Sp. Technol., vol. 155, p. 106209, 2025, doi: 10.1016/j.tust.2024.106209.

X. Xu et al., “Dispersion, mechanical, hydrophysical properties and mechanistic analysis of improved dispersive soil using guar gum,” Bull. Eng. Geol. Environ., vol. 84, no. 1, p. 56, 2025, doi: 10.1007/s10064-024-04082-1.

Y. Yang et al., “Development status, economic benefits and future prospects of CCUS-EOR industry,” China Min. Mag., vol. 34, no. 2, pp. 190–203, 2025, doi: 10.12075/j.issn.1004-4051.20242290.

Y. Zhao, Y. Du, and Q. Yan, “Challenges, progress, and prospects of ultra-long deep tunnels in the extremely complex environment of the Qinghai–Xizang Plateau,” Engineering, vol. 44, pp. 162–183, 2025, doi: 10.1016/j.eng.2024.05.020.

Downloads

Additional Files

Published

2026-08-29

How to Cite

[1]
A. Krisdiyanto, A. S. Kriswandaru, and K. Dewi, “Impact Analysis of Government Regulation No. 14 of 2021 on Construction Project Efficiency”, J.Gen.Educ.Humanit., vol. 5, no. 4, pp. 5629–5642, Aug. 2026.

Issue

Section

Articles